For Laggan Tormore Gas Plant at Shetland. Fabrication of Structural steelwork, Piping, assembly of the final units including Insulation, Electrical and Instrumentation systems, comprising of: MEG Package; Desalination Unit, completed… read more →
Quad 204, sand clean up package, being loaded onto transport ship at Buckie. Completed package 19Tonnes, built, fully assembled and packed for shipping.
Produced water & Sand handling package for Chirag Oil Project, Azerbaijan. 3 Modular units for Produced water and sand handling. Duplex, Super Duplex, stainless and carbon steel materials. Total package… read more →
Hebron Project, CFU Package IMG 9061e: Design, fabrication, testing, painting on the Duplex vessels and pipework, steel structure. Assembly of all components including: Electrical, Instrument, trace heating and insulation.